Incident date: 30 October 2026
Started: 14:59 WIB
Service recovered: 18:31 WIB
Time until service recovery: About 3 hours and 32 minutes
Latest status: Recovered.
All times in this report are WIB (UTC+7).
On 30 October 2026, some Cekat features became slower or stopped progressing as expected. This affected AI replies, follow-up messages, broadcasts, and automatic conversation resolution.
The problem was in Temporal, the system Cekat uses to schedule and manage background work. The part of Temporal that tracks each task's progress could not reliably read the information it needed from the database. As a result, it could not reliably pass work to the workers that carry out those tasks.
The team increased Temporal's capacity, and service recovered by 18:31 WIB. Most waiting tasks had cleared by then. About 410 delayed-message tasksremained and were being processed quickly.
Some tasks had stopped retrying after repeated failures and needed separate attention. The investigation did not confirm when all remaining work was completed or cancelled.
Customers experienced delays in:
There were also two risks beyond delays:
No permanent data loss was confirmed. The investigation did not confirm whether any outdated messages were sent or what happened to every stopped task.
Before processing a task, Temporal needs to read its saved progress. Each of the two processing instances responsible for this had only four connections available to read from the database at the same time.
That limit had been reduced earlier to fit a smaller database setup. Although the database was later upgraded, Temporal's access limit stayed the same.
As more work arrived, tasks waited too long for access and failed. They then tried again, adding even more work to an already overloaded system.
More work arrived → tasks waited too long → tasks failed and retried → the waiting work grew.
The team was gradually moving delayed messages and follow-ups from the previous background-processing system to Temporal. The amount of database work was already about 2.5 times the previous day's level.
Around 15:00, Temporal was handling 80% of the work being moved over. A broadcast campaign added another burst of tasks. This appears to have pushed the system beyond what it could handle.
The database itself was initially responding quickly. The main problem was Temporal's limited capacity to access it.
Adding more processing instances helped. Increasing from two to four gave Temporal more capacity to read task information and spread the work. Recovery took time because the new instances had to catch up on overdue tasks.
Moving new work back to the previous system helped reduce incoming load, but was not enough on its own.Tasks already in Temporal kept retrying. Broadcasts also continued using Temporal, so moving delayed messages and follow-ups back did not stop all incoming work.
Adding computing power did not solve the problem.The initial constraint was database access, not computing power. The accompanying restart may have made things worse temporarily because the system had to reload information it previously held in memory.
The incident also highlighted problems in how scheduled jobs decide whether an action is still appropriate. A job must check the conversation when it runs, rather than assume nothing has changed since it was scheduled.
P0 = most urgent · P1 = high priority
Owners and completion status for these actions have not been recorded.
We increased the amount of work sent to Temporal without enough capacity to handle busy periods. Once failed tasks started retrying, reducing new traffic was not enough to recover.
We need to plan for both busy periods and delayed work. Just as importantly, every scheduled action must check whether it is still appropriate before sending a message or resolving a conversation.